UPT Perpustakaan Universitas Andalas
Repositori PerpustakaanUniversitas Andalas
 

Determination of Preventive Replacement Age of V-Belt on the Vibrating Feeder to Minimize Downtime in the Split Stone Plant PT Semen Padang

dc.contributor.authorArpiani, Murni
dc.date.accessioned2026-09-24T21:30:46Z
dc.date.issued2026-04-20
dc.descriptionReinny Patrisina, S.T., M.T.,Ph.D.
dc.description.abstractMaintenance planning is essential to ensure machine reliability and production efficiency. The split stone production line at PT Semen Padang consists of machines that operate in an integrated and interconnected system. Under these conditions, failure of a single component can disrupt or even halt the entire production process. One component that significantly contributes to downtime is the V-belt on the Vibrating Feeder machine. Based on historical data, this component recorded a total downtime of 38.25 hours with 20 failure occurrences, including 10 replacement actions during the observation period. This study aims to determine the optimal preventive replacement age of the V-belt on the Vibrating Feeder machine in the split stone production line at PT Semen Padang in order to minimize downtime. The historical data used in this research cover the period from October 2023 to October 2025, including component operating hours and the duration of downtime caused by V-belt failures. The determination of the preventive replacement age was conducted using the Optimal Preventive Replacement Age method, an approach that focuses on identifying the replacement age of a component such that total downtime per unit time is minimized. The analysis results indicate that preventive replacement of the V-belt should be performed after approximately 257 operating hours. Implementing this age is estimated to reduce total downtime by 8% compared to the current reactive maintenance practice. In addition, the system availability reaches 99.35%. From an economic perspective, preventive maintenance does not significantly reduce total operational costs compared to corrective maintenance. This is due to the relatively low downtime under existing conditions and the small difference in maintenance duration. However, preventive maintenance enables better resource planning, thereby reducing cost variability and minimizing unexpected failures that may increase maintenance complexity. These findings indicate that preventive maintenance of the V-belt is technically effective in improving system reliability while also providing benefits in achieving more stable and well-controlled cost management.
dc.identifier.urihttps://ailib.my.id/handle/123456789/51191
dc.language.isoid
dc.publisherUniversitas Andalas
dc.subjectAge Replacement
dc.subjectDowntime
dc.subjectMaintenance Planning
dc.subjectSplit Stone Plant
dc.subjectV-belt
dc.subject.classificationT Technology (General)
dc.subject.classificationTJ Mechanical engineering and machinery
dc.titleDetermination of Preventive Replacement Age of V-Belt on the Vibrating Feeder to Minimize Downtime in the Split Stone Plant PT Semen Padang
dc.typeThesis
dcterms.dateSubmitted2026-04-21
dcterms.referencesAddini, H. A., Damayanti, D. D., & Budiasih, E. (2025). Pemeliharaan Mesin dengan Penerapan Total Productive Maintenance (TPM) dan Age Replacement untuk Mengurangi Downtime pada Mesin Turret Milling Di CV.XYZ. EProceedings, 12(1), 576–586. https://openlibrarypublications.telkomuniversity.ac.id/inde.php/engineering/article/download/26092/24874 Afdal, Z. A., & Linarti, U. (2023). Preventive Maintenance Analysis Using Monte Carlo Simulation and Failure Mode and Effect Analysis (FMEA). Jurnal Ilmiah Teknik Industri, 22(2). https://doi.org/10.23917/jiti.v22i2.21900 Ahadi, G. D., Nur, N., & Ersela, L. (2023). The Simulation Study of Normality Test Using Kolmogorov-Smirnov. 6(1). Alfionita, S., & Alifin, F. I. (2023). Preventive Maintenance Analysis Based on Mean Time Between Failure (MTBF) and Mean Time to Repair (MTTR). Angkasa: Jurnal Ilmiah Bidang Teknologi, 15(2), 251–262. https://doi.org/10.28989/angkasa.v15i2.1833 Arzaq, M., Putra, R. E., & Muslim, A. (2024). Evaluasi Kinerja Cooler Tipe Cross Bar Pada Unit Produksi Terak 2 Pabrik Indarung VI PT Semen Padang. 5(1), 10–13. Bangun, C. S., Jalil, A., Amperajaya, D., & Rasjidin, R. (2022). Preventive Maintenance Scheduling with Age Replacement Method at CNG Station. 4(2), 153–163. Campbell, J. D., Jardine, A. K. S., & Joel McGlynn. (2011). Asset Management Life-Cycle Decisions. Cristian, J., Ojeda, O., Moraes, B. De, Vicente, C., Filho, D. S., Pereira, M. D. S., Pereira, D. Q., Cristina, I., & Dias, P. (2025). Application of a Predictive Model to Reduce Unplanned Downtime in Automotive Industry Production Processes: A Sustainability Perspective. 1–29. Cui, Y., Zhang, Y., Wang, Z., Fu, H., & Mao, X. (2018). Interval Statistic Based Reliability Analysis Method on Small Sample Hot Test of Satellite Thruster. 60, 581–591. Daniel Egidio. (2025). Implementation of Preventive Maintenance with the Age Replacement Model on the Tertiary Crusher at PT ABC. Dinkar, B. K., Mukhopadhyay, A. K., & Chattopadhyaya, S. (2021). Statistical Reliability Assessment for Small Sample of Failure Data of Dumper Diesel Engines Based on Power Law Process and Maximum Likelihood Estimation. Applied Sciences. Ebeling, C. E. (1997). An Introduction to Reliability & Maintainability Engineering (p. 486). Ermanto, S. A., Rifai, R., Sasue, O., Pradana, A., et al. (2025). Application of The Weibull Distribution Model to Estimate. 6(1), 25–30. Hamasha, M. M., Bani-Irshid, A. H., Al Mashaqbeh, S., et al. (2023). Strategical selection of maintenance type under different conditions. Scientific Reports, 13(1), 1–19. https://doi.org/10.1038/s41598-023-42751-5 Higgins, L. R., Mobley, R. K., & Smith, R. (2002). Maintenance Engineering Handbook. Iwarue, J. O. (2025). Impact of Preventive Maintenance Practices on Productivity. British Journal of Management and Marketing Studies, 8(1), 118–137. https://doi.org/10.52589/BJMMS-QRMKXG9R Jardine, A. K. S., & Tsang, A. H. C. (1974). Maintenance, Replacement and Reliability. Electronics and Power, 20(4). https://doi.org/10.1049/ep.1974.0101 Kusmono, B. W. A., Bangun, Y. R., & Sushandoyo, D. (2024). Reducing Loss Production Opportunity (LPO) at PT Pertamina EP Donggi Matindok field. Interdisciplinary Social Studies, 3(4). https://doi.org/10.55324/iss.v3i4.730 Li, X., Chen, W., Li, F., & Kang, R. (2021). Reliability Evaluation with Limited and Censored Time-To-Failure Data Based on Uncertainty Distributions. 94, 403–420. Agustiawan, E. A., Fathoni, M. Z., & Widyaningrum, D. (2021). Usulan Preventive Maintenance Pada Mesin Hanger Shot Blast Kazo Dengan Metode Age Replacement Di PT Barata Indonesia. MATRIK, XXII(1). https://doi.org/10.350587/Matrik Mitsuboshi. (2024). FAQ – Industrial Power Transmission Belts dan Produk lainnya. Mitsuboshi Belting Ltd. https://indonesia.mitsuboshi.com/faq/general/ Montgomery, D. C. (2022). Applied Statistics and Probability for Engineers. John Wiley and Sons, Inc. Muhammad Nabil Ibadurrahman. (2025). Chain Conveyors Preventive Replacement Schedule: A Case Study. Universitas Andalas. Mustajib, M. I., Yusron, R. M., & Albab, U. (2025). Optimal Replacement Interval Based on Reliability Centered Maintenance: A Case Study of Indonesian Railroad Company. 26(1), 143–160. Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Productivity Press. Nunes, P., Santos, J., & Rocha, E. (2023). Challenges in Predictive Maintenance. CIRP Journal of Manufacturing Science and Technology, 40, 53–67. https://doi.org/10.1016/j.cirpj.2022.11.004 Octavia, E. A. (2025). Preventive Maintenance Planning Using Age Replacement Method for Head Router Machines. 10(2), 1–12. https://doi.org/10.21070/acopen.10.2025.12012 Qarina Azka Lubis. (2025). Usulan Perbaikan Penjadwalan Penggantian Komponen Top Cylinder Mesin Press. Rakrak, M. (2025). Exploring Variability in Data: The Role of Range, Variance, and Standard Deviation. 8(3), 1327–1331. https://doi.org/10.47191/ijmra/v8-i03-47 Rakyta, M., Bubenik, P., Binasova, V., & Gabajova, G. (2024). The Change in Maintenance Strategy on the Efficiency and Quality of the Production System. Sellitto, M. A., & Pinho, B. (2023). Maintenance Strategy Choice Supported by the Failure Rate Function. Periodica Polytechnica Social and Management Sciences, 31(1), 38–51. https://doi.org/10.3311/PPso.18627 Sopan, L. E. P., et al. (2024). Identification of Basalt Rock Distribution Using Resistivity Geoelectric Method. Eksplorium, 45(2), 91–98. https://doi.org/10.55981/eksplorium.2024.7081 Susilo, D. D., & Widjajati, E. P. (2025). Proposed Preventive Maintenance of Air Screw Compressor Machine Using FMEA and Modularity Design Methods at PT XYZ. IJIEM. https://doi.org/10.22441/ijiem.v5i3.23742 Ulfah, M., Mutaqin, A. I. S., & Saputra, A. A. (2021). Usulan Preventive Maintenance Mesin Press 500 Ton Menggunakan Metode RCM II di PT DHI. Journal Industrial Services, 6(2), 184. https://doi.org/10.36055/62014 Walpole, R. E., Myers, R. H., Myers, S. L., & Ye, K. (2012). Probability & Statistics for Engineers & Scientists (9th ed.). Pearson. Wijaya, A. R. (2024). Method for Determining the Number of Maintenance Personnel. 25(2), 231–237. Woo, S. (2019). Reliability Design of Mechanical Systems: A Guide for Mechanical and Civil Engineers (2nd ed.). https://doi.org/10.1007/978-981-13-7236-0 Zhao, D., Liu, Y., Gao, J., Liu, S., Dong, L., & Cheng, M. (n.d.). Fatigue Life Prediction of Wire Rope Based on Grey Particle Filter Method under Small Sample Condition.
local.eprints.dirdisk0/00/52/41/35
local.eprints.division07A
local.eprints.id524135
local.eprints.typethesis/2Sarjana
local.eprints.urihttp://scholar.unand.ac.id/524135/
local.fakultasFakultas Teknik
local.identifier.nim2210932049
local.prodiS1 Teknik Industri
local.thesis.levelSkripsi

Files

Collections