Determination of Preventive Replacement Age of V-Belt on the Vibrating Feeder to Minimize Downtime in the Split Stone Plant PT Semen Padang
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Universitas Andalas
Abstract
Maintenance planning is essential to ensure machine reliability and
production efficiency. The split stone production line at PT Semen Padang consists
of machines that operate in an integrated and interconnected system. Under these
conditions, failure of a single component can disrupt or even halt the entire
production process. One component that significantly contributes to downtime is
the V-belt on the Vibrating Feeder machine. Based on historical data, this
component recorded a total downtime of 38.25 hours with 20 failure occurrences,
including 10 replacement actions during the observation period.
This study aims to determine the optimal preventive replacement age of the
V-belt on the Vibrating Feeder machine in the split stone production line at PT
Semen Padang in order to minimize downtime. The historical data used in this
research cover the period from October 2023 to October 2025, including component
operating hours and the duration of downtime caused by V-belt failures. The
determination of the preventive replacement age was conducted using the Optimal
Preventive Replacement Age method, an approach that focuses on identifying the
replacement age of a component such that total downtime per unit time is
minimized.
The analysis results indicate that preventive replacement of the V-belt
should be performed after approximately 257 operating hours. Implementing this
age is estimated to reduce total downtime by 8% compared to the current reactive
maintenance practice. In addition, the system availability reaches 99.35%. From an
economic perspective, preventive maintenance does not significantly reduce total
operational costs compared to corrective maintenance. This is due to the relatively
low downtime under existing conditions and the small difference in maintenance
duration. However, preventive maintenance enables better resource planning,
thereby reducing cost variability and minimizing unexpected failures that may
increase maintenance complexity. These findings indicate that preventive
maintenance of the V-belt is technically effective in improving system reliability
while also providing benefits in achieving more stable and well-controlled cost
management.
Description
Reinny Patrisina, S.T., M.T.,Ph.D.
