The East Pamai Block, which is located in the Rumbai-Riau area, is a
work area granted by the state through SKK Migas to the KKKS (Cooperation
Contract Contractor) PT. Northern Yamano Technology Oil Resources East
Pamai (PT. NYT EP ). The drilling of this exploration well is part of the Work
Plan and Firm Commitment between PT. NYT EP with SKK Migas, besides that
it is also important to prove the potential contained in the block. Rigs are equipment
that will be used and must be prepared in this drilling job, therefore it is necessary
to calculate the capacity of the rig accurately to support the success and efficiency
of drilling costs. The plan for a smooth exploration well drilling project for the
Falah-01 well will be carried out by PT. Northern Yamano Technology Oil
Resources East Pamai (PT. NYT EP).
Based on the results of the technical analysis and costs, it is expected that
the drilling operation will run well and the costs will not exceed the AFE (Authority
For Expenditure) approved by SKK Migas as regulator. The method used is to
calculate the HP Drawwork capacity, Mast capacity and Substructure capacity using
data from the well to be drilled. The results obtained from the calculation of each
capacity are that the rig that will be used in the project is in accordance with the
profile of the well, has a good safety factor and will be cost efficient.