UPT Perpustakaan Universitas Andalas
Repositori PerpustakaanUniversitas Andalas
 

EVALUASI TEKNIS GEOMETRI PELEDAKAN TERHADAP FRAGMENTASI BATUAN ANDESIT PT KOTO ALAM SEJAHTERA

Loading...
Thumbnail Image

Journal Title

Journal ISSN

Volume Title

Publisher

Universitas Andalas

Abstract

ABSTRACT Dedi Yulhendra :Evaluation of Explosion Geometry to Achieve 20,000 Ton Production Target In April 2017 At Andesite Stone Mine Location PT. Koto Alam Sejahtera Jorong Polong Duo Nagari Koto Alam, Koto Baru Pangkalan Sub-district, Lima Puluh Kota District, West Sumatra. PT. Koto Alam Sejahtera is a company engaged in Andesite stone mining. Andesite Stone mining uses open pit system with Quarry method, located in Jorong Polong Duo Kenagarian Koto Alam area, Pangkalan Koto Baru Subdistrict, Lima Puluh Kota District, West Sumatra. To take andesite stone first stripping the cover. Due to the harsh rock conditions, the process of stripping is done by drilling and blasting method which is an effective and economical way of rocking. The blasting process is an activity to render rocks from its parent rock. Geometry applied by PT. Koto Alam Sejahtera is Burden 2 m, Spacing 2 m, Depth hole 6 m, Stemming 2 m, Subdrilling 0 m, and Lenght of explosive material 4 m, height 5,5 m level with 3 inch hole diameter. The average data obtained writer field with burden 2,02 m, Spacing 2,08 m, the depth of 5,77 m explosion hole, the number of holes 287, the average fragmentation of 24,33 cm blast results and monthly explosive volume 17.976,46 Ton < 20.000 Tons / Month. From the theoretical calculation according to R. L. Ash theory, the burden is 1.9 m, 2.2 m spacing, 6m explosive hole depth, 310 hole number, 24,06 cm blast detonation rate and monthly blast volume 20.214,48 Ton / Month. Keywords: Blasting geometry, fragmentation, Production

Description

Ir. Benny Dwika Leonarda, ST, MT, IPM

Keywords

Citation

Collections

Endorsement

Review

Supplemented By

Referenced By