EVALUASI & PERBAIKAN TATA LETAK LANTAI PRODUKSI PADA PT KUNANGO JANTAN
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Universitas Andalas
Abstract
The manufacture industries is an industrial activity in order producing
goods or services. Factory where the instrument of industrial activity happen is an
important factor in the development of existing industries in the manufacturing
company. Improvement in layout production is an important thing in order to
achieve a common goal of company, to get a profits in industry as much as
possible. PT Kunango Jantan is a companies located in Padang city which is
engaged in manufacturing, especially in production of "Iron Pillar" which is often
found in electricity poles or telephone poles. This company is still not optimal in
distance and cost as well and the use of resources such as machinery, material
handling, operator, and arragement of existing facilities on the production floor.
Making design analysis follow the procedures Systematical Layout
Planning by calculating the coefficient of outflow and inflow coefficient in the
matrix from to chart which is showed linkage facilities machines with table
priorities. Layout design is also use computerized program such as Automated
Layout Design Program (ALDEP), COMLAD, BLOCPLAN, dan Computerized
Relative Allocation of Facilities Technique (CRAFT). The arrangement machine
is describing by Activity Relationship Diagram (ARD). Finally, it’s obtained
some alternative options of floor layout arrangement chosen by the lowest
distance and lowest cost of material handling costs.
According to alternatif layout design, it’s obtained various material
handling cost which each cost of OUTFLOW, INFLOW, Automated Layout
Design Program (ALDEP), COMLAD, BLOCPLAN, dan Computerized Relative
Allocation of Facilities Technique (CRAFT) in following are Rp. 1.122.553,83 ;
Rp. 1.275.651,38 ; Rp. 1.204.667,43 ; Rp. 1.175.320,4 ; Rp. 1.926.848,77 ; Rp.
2.738.719,66. The chosen alternatif is COMLAD which cost is Rp. 1.122.53,83.
Keywords : Systematical Layout Planning, Activity Relationship Diagram,
Material Handling Cost