Pemodelan Estimasi Biaya Awal Proyek Rekontruksi Jalan Dengan Metode Cost Significant Model : Studi Kasus Paket Rekonstruksi Jalan Nasional Wilayah II Sumatera Barat
| dc.contributor.author | Rahmat Donal | |
| dc.date.accessioned | 2026-09-25T15:48:46Z | |
| dc.date.issued | 2014 | |
| dc.description.statementofresponsibility | Rahmat Donal | |
| dc.format.extent | vii, 75 hal,; 30 cm | |
| dc.identifier.other | S2140768 | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/171753 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Teknik Sipil | |
| dc.title | Pemodelan Estimasi Biaya Awal Proyek Rekontruksi Jalan Dengan Metode Cost Significant Model : Studi Kasus Paket Rekonstruksi Jalan Nasional Wilayah II Sumatera Barat | |
| dc.type | Thesis | |
| local.publication.place | Padang | |
| local.slims.id | 102437 | |
| local.thesis.level | Skripsi |
