Waste Analysis in UD Tani Mulia With Lean Manufacturing Approach
| dc.contributor.advisor | Dr. Henmaidi, S.T., M.Eng., Sc., Ph.D, Dr. Henmaidi, S.T., M.Eng., Sc., Ph.D | |
| dc.contributor.author | Fahdhila, Dhila | |
| dc.date.accessioned | 2026-09-24T21:18:40Z | |
| dc.date.issued | 2022-09-06 | |
| dc.description | Dr. Henmaidi, S.T., M.Eng., Sc., Ph.D | |
| dc.description.abstract | The level of competition in business is getting more challenging. Every industry should have the ability to increase competitiveness. One of the keys that can support the industry's competitive ability is the quality of the entire production process. UD Tani Mulia is a food and beverage industry that produces noodles with the "Rumah Adat" brand. UD Tani Mulia is an Industry that has a high demand, but the Production is uncontrollable, has a long lead time, and its capacity is limited. Therefore, UD Tani Mulia can't fulfill all the customer needs. Based on the observation, the production process at UD Tani Mulia is still not optimal. Many activities do not add value, causing long production lead times. The percentage of value-added activities is 39%. Therefore, it is necessary to conduct a waste analysis to reduce lead time and increase company productivity. After analysis using the Waste Assessment Model, the three wastes that have the most influence on manufacturing lead time are waiting, inappropriate processing, and motion waste, with 23%, 18%, and 16%. The waste that occurs is then analyzed using a Fishbone diagram to find out the cause of the waste. The causes of wastage include the lack of material planning and control, uncontrollable drying process, limited drying container, downtime because of a power outage and breakdown machine, undisciplined workers, ineffective rolling and packaging processes, manual loading and unloading of materials activity, and a lot of idle time of drying operators. The recommendations for improvement proposed to reduce waste and increase productivity include pull-replenishment as the material planning and control, workplace organization, one-piece flow in the packaging process, rolling process improvement, and multipurpose dryer instead of the manual drying process. The proposed improvements can increase the proportion of value-added time. The current PCE is 39% and can increase to 93%. | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/48723 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Lean Manufacturing | |
| dc.subject | Waste | |
| dc.subject | Lead Time | |
| dc.subject | and Productivity | |
| dc.subject.classification | QA Mathematics | |
| dc.subject.classification | TS Manufactures | |
| dc.title | Waste Analysis in UD Tani Mulia With Lean Manufacturing Approach | |
| dc.type | Thesis | |
| dcterms.dateSubmitted | 2022-09-09 | |
| dcterms.references | Abdullah, F. (2003). Lean Manufacturing Tools and Techniques in the Process Industry with a Focus on Steel. USA: University of Pittsburgh. Alfiansyah, R. (2018). Identification of Waste with the Waste Assessment Model Method in the Application of Lean Manufacturing for Production Process Improvement (Case Study of the Glove Production Process). Surabaya: Institut Teknologi Sepuluh November. Arifianto, A. (2018). Implementation of Total Productive Maintenance (TPM) Using the Overall Equipment Effectiveness Method (Case Study: PT. Triangle Motorindo). Yogyakarta: Universitas Islam Indonesia. Banton, C. (2020). Acceptable Quality Level (AQL), accessed in https://www.investopedia.com/terms/a/acceptable-quality-level aql.asp#:~:text=The%20AQL%20for%20major%20defects,1%EF%BB%BF at 22 June 2022. Batubara, S. & Nainggolan, E. A. (2018). Production and Preventive Scheduling Integration Maintenance to Minimize Makespan Using Heijunka and Batch Methods – Backward Scheduling (Case Study of PT. BMC). Industrial Engineering Journal, 8 (3), 159-171. Chin, C. (2010). Approximating the Process Cycle Efficiency of Non-Physical Production Systems, accessed in https://iglcstorage.blob.core.windows.net/ at 27 March 2022. Dave, Y. (2012). The benefit of Standardized Work: A Study. International Journal. 1 (1), 95-97. Firdaus, D. A. (2018). Identification of Waste with a Value Stream Mapping Approach in the Sanding Section of the Reverse Flow Coater (Case Study: PT Yamaha Indonesia). Yogyakarta: Universitas Islam Indonesia. George, M. L. (2002). Lean Six Sigma - Combining Six Sigma Quality with Lean Production Speed, McGraw-Hill, New York, NY. Gunaki, P., Teli, S. N., & Siddiqui, F. (2015). A Review Paper on Productivity Improvement by Value Stream Mapping. India: Department of Mechanical Engineering. Gunawan, F. E., Budiman, A. S., Pardamean, B. (2022). Design and energy assessment of a new hybrid solar drying dome – Enabling Low-Cost, Independent and Smart Solar Dryer for Indonesia Agriculture 4.0. IOP Conf. Series: Earth and Environmental Science. Guntoro, R. C. & Adhiana, T. P. (2019). Identification of Waste Using the Waste Assessment Model. Prosiding Seminar Nasional and Call for Papers, 41-48. Haq, K. M. I. (2016). Application of Value Stream Analysis Tool (VALSAT) to Reduce Turn Around Process Time for Planning and Procurement of Spare Parts (Case Study: Phonska IV Plant PT Petrokimia Gresik). Surabaya: Institut Teknologi Sepuluh Nopember. Heragu, S. S. (2009). Material Handling System Design. Louisville: University of Louisville Herdi, T. & Dores, A. (2020). Improving Cash Availability of ATM using Lean Replenishment Pull for Sharia Bank in Indonesia. Business Management Journal. 10 (2), 78-88. Hopp, W. J., & Spearman, M. L. (2000). Factory Physics: Foundations of Manufacturing Management, Irwin/McGraw-Hill, Boston, MA. Kovalenko, O. (2019). Reducing Transportation Waste with A Real-Time Asset Location System, https://blog.indoorway.com/, accessed on 30th June 2022 at 10.33 AM. LBS Partners. (2014). Introduction to Lean. Ireland: LBS Partners. Liker, J. K. (2004). The Toyota Way. McGraw-Hill: New York. Lukmandono. (2019). Implementation of Waste Reduction at Operational Division with Lean Manufacturing Concept. IOP Conference Series: Materials Science and Engineering Mamat, K. A., Yusof, M. S., Fauziah W., & Yusoff W. (2017). Dehydration of Traditional Dried Instant Noodle (Mee Siput) Using Controlled Temperature & Humidity Dryer. IOP Conf. Series: Materials Science and Engineering. Maulana, Y. (2019). Identification of Waste by Using the Value Stream Mapping Method in the Housing Industry. Jurnal Jieom. 2 (2), 12-19. Martin, K. & Osterling, M. (2014). How to Visualize Work and Align Leadership for Organizational Transformation. USA: McGraw-Hill Education. Ministry of Industry. (2021). “Exploring the Potential for Cooperation in the Food and Beverage Industry”, https://kemenperin.go.id/article/22963/Menggali-Potensi�Kerja-Sama-Industri-Makanan-Minuman, accessed on 19 March 2022 at 07.07 AM Mughni, A. (2012). Waste Assessment in the Process of Shoe Production with Waste Relationship Matrix. Conference Paper. Prabowo, E. R. (2013). Implementation of Lean Supply Chain with Proposed Improvements Using DMAIC Method. Industrial Engineering Journal. 1(1), 48- 53. Radasanu, A. C. (2016). Inventory Management, Inventory Level, and Safety Stock. Journal of Public Administration, Finance and Law. Rother, M. & Shook, J. (1999). Value Stream Mapping to Create Value and Eliminate Muda. USA: The Lean Enterprise Institute. Rusmawan, H. (2020). Lean Manufacturing Design Using Value Stream Mapping (VSM) Method at PT Tjokro Bersaudara (PRIOK). Journal of Industrial Engineering Optimization. 2 (1), 30-35. Setiawan, I., Ojakma S. P. T, & Humiras, H. P. (2021). Value Stream Mapping: Literature Review and Implications for Service Industry. Jakarta: Talenta Publisher. Siswanto, E. M. W. & Rusdjijati, R., (2021). Design of Salak Peeler with Approach Engineering Ergonomics. Borobudur Engineering Review, 1 (1), 25-38. Tri, D., Rakhmanita, A., & Anggraini. (2019). Implementation of Kaizen in Improving Performance (Case Study of Manufacturing Companies in Tangerang). Journal Ecodemica, 3 (2), 198-206. Viana, N. (2017). Lean Manufacturing Analysis to Reduce Waste in CTC Black Tea Production (Case Study of PT Perkebunan Nusantara XII Wonosari Tea Plantation, Malang). Malang: Universitas Brawijaya. Wignjosoebroto, S. (2000). Ergonomics, Motion and Time Studies: Analytical Techniques for Increasing Work Productivity. Edition I 2nd Printing. Surabaya: Guna Widya Publisher. Yazdani, A. A. & Moghaddam, R. T. (2012). Integration of the Fishbone Diagram, Brainstorming, and AHP Method for Problem Solving and Decision Making. The International Journal of Advanced Manufacturing Technology, 651-657 Zadry, H. R., Susanti, L., Yuliandra, B., & Jumeno, D. (2015). Work System Analysis and Design. Padang: Andalas University Press | |
| local.eprints.dir | disk0/00/11/27/10 | |
| local.eprints.division | 07A | |
| local.eprints.id | 112710 | |
| local.eprints.type | thesis/diploma | |
| local.eprints.uri | http://scholar.unand.ac.id/112710/ | |
| local.fakultas | Fakultas Teknik | |
| local.identifier.nim | 1810932035 | |
| local.prodi | S1 Teknik Industri | |
| local.thesis.level | Skripsi |
