| dc.description.abstract | The trend of tofu consumption in West Sumatra, based on Badan Pusat Statistik (BPS), particularly in Padang City, increased from 2022 to 2024, as reflected in Tahu Sumedang CC. Currently, regular daily production reaches 29.120 units, but 2,98% of the 336 working hours in February 2025 were allocated to overtime. During the two-week observation period in the same month, 6,04% of demand experienced distribution delays due to difficulties in meeting high demand. Observations also revealed inefficiencies in production activities, such as 19,69% delay at workstation IV by the first worker while the second worker is preparing the tofu before they continue to complete the transferring to the pressing station together. This study aims to increase production capacity through work method improvements and workload balancing. Work method improvements are carried out by applying the principles of the motion economy, while the balancing is conducted using the workload balancing approach. The evaluation results are then followed by capacity planning to assess whether the proposed improvements are sufficient to meet future demand projections. Based on the work method improvement calculations, the delay time by the first worker while the second worker is preparing the tofu at workstation IV was successfully reduced to 2,25% allowing the remaining time to be used to assist other workstations. Workload balancing also succeeded in reducing 41,48 minutes/shift, equivalent to 1 hour and 22,96 minutes/day. In addition, the balancing process increased production capacity by 3.640 tofu units/day, or approximately 12,5% of the current production. This additional capacity is expected to meet future consumer demand without the need to purchase additional machines or hire more workers. | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/50906 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Inefficiency | |
| dc.subject | Delay | |
| dc.subject | Production Process | |
| dc.subject | Work Method | |
| dc.subject | Workload Balancing | |
| dc.subject.classification | TS Manufactures | |
| dc.title | Proposed Work Method Improvement and Workload Balancing to Increase Regular Capacity at Tahu Sumedang CC | |
| dc.type | Thesis | |
| dcterms.dateSubmitted | 2025-11-04 | |
| dcterms.references | Abdilah, & Nurbani, S. N. (2022). Perencanaan Kapasitas Produksi untuk Memenuhi Permintaan Konsumen Menggunakan Metode Rough Cut Capacity Planning (RCCP). Jurnal Teknologi Terapan, 6(2), 221–230. Afrian, H. L., Alfatiyah, R., & Subarman, K. (2020). Perbaikan Sistem Produksi Dengan Metode Time Study Dan Line Balancing Untuk Efisiensi Proses Pengemasan Pada Cv. Tirta Sasmita. Teknologi, 3(1), 73–81. Ainurrohma, S. A., & Retnaningsih, S. M. (2022). Analisis Pengukuran Waktu Kerja di UD. Fish Design Sidoarjo. Jurnal Sains Dan Seni ITS, 11(1). Alhikmah, P., Budiharti, N., & Galuh, J. H. (2024). Perencanaan Kapasitas Produksi Alen Alen Menggunakan Metode Rough Cut Capacity Planning (Rccp)(Studi Kasus Umkm Pak Miran). Jurnal Valtech, 7(1), 179–192. Annisawati, A. A., Kambali, I., & Yanto, R. T. Y. (2021). Time And Motion Analysis: Efficiency Of Direct Marketing Officer Workload In The Digital Disruption Era. Jurnal Ekonomi Dan Bisnis, 8(2). Arga Juniv Samsudin, & Handy Febri Satoto. (2024). Perbaikan Stasiun Kerja Guna Meningkatkan Efisiensi Gerakan dan Produktivitas pada Operator Divisi Manual Oplos PT.XYZ. Jurnal Surya Teknika, 11(2), 646–654. https://doi.org/10.37859/jst.v11i2.8305 Arifin, M., & Tjandra, S. S. (2024). Rough Cut Capacity Planning dengan Menggunakan Matriks Skill dalam Pemenuhan Order di PT X Manufaktur Furnitur. Jurnal Rekayasa Sistem Industri, 13(2), 177–190. Astuti, F., Wahyudin, W., & Azizah, N. (2022). Perancangan Ulang Tata Letak Area Kerja untuk Meminimasi Waktu dan Jarak Aliran Proses Produksi. Media Ilmiah Teknik Industri, 21(1), 20–31. Audinasyah, C. S. (2024). Sistem Forecasting Perencanaan Produksi dengan Metode Single Exponential Smoothing Pada Home Industry Tempe Putera Sejahtera. Jurnal EMT KITA, 8(3), 845–853. Bandio, F. R., Nasution, R. H., & Siregar, Z. H. (2022). Analisis kapasitas produksi menggunakan metode Rought Cut Capacity Planning (RCCP). Jurnal VORTEKS, 3(2), 221–228. Barus, Mustafa, & Thahirah, F. S. (2022). Single Eksponensial Smoothing Pada PT . Food. Jurnal Ilmu Pengetahuan Sosial, 9(2), 909–920. Barus, T., Wulandari, Y. R. E., Hutagalung, R. A., & Subali, D. (2020). Pelatihan Membuat Tahu Higienis pada WKRI Paroki St. Ignatius Loyola Semplak, Bogor. Jurnal Pemberdayaan Masyarakat, 4(1), 20–29. Buulolo, P. (2019). Beberapa Pertimbangan Dalam Perencanaan Produksi. Jurnal Riset Manajemen Dan Bisnis, 4(2), 14–22. Erlangga, M. R., Basuki, D. E., Jannah, R. M., Apriani, R. A., & Azizah, N. A. (2023). Analisis Perencanaan Kapasitas dan Penjadwalan Produksi Produk Gula pada PG. Madukismo. Journal of Industrial View, 5(2), 38–52. Hanjaya, T. J., & Susanto, N. (2024). Usulan Perbaikan Tata Letak Area Proses Warping Dengan Metode Konvensional Berbasis 5S (Studi Kasus: Pt Dunia Setia Sandang Asli Tekstil 4). Industrial Engineering Online Journal. Harahap, J. (2017). Tahu Sumedang sebagai Makanan Orang Sunda yang Sehat dan Bergizi: Sebuah Studi Ilmu Sosial untuk Kesehatan. Jurnal Pendidikan Sains Sosial Dan Kemanusiaan, 10(1), 117–128. Harefa, E. S., Mutiara, P., & Mariaty, L. (2022). Pengukuran Waktu Standard Proses Produksi Batu Bata. Jurnal Ruang Luar Dan Dalam FTSP, 04(02), 2–5. Herlina, R. L. (2019). Analisis Gerakan-Gerakan Kerja Pada Pembuatan Rumah Kunci Dengan Menggunakan Metode Motion Study. Ensains Journal, 2(3), 215–221. Kementerian Keuangan Republik Indonesia. (2023). APBN KITA (Kinerja APBN On-Track menjaga perekenomian dan masyarakat). Kementerian Keuangan Republik Indonesia. Kementerian Keuangan Republik Indonesia. (2024). APBN KITA (Kinerja APBN Terjaga On-Track:Melindungi Perekonomian dan Kesejahteraan Masyarakat). In Kementerian Keuangan Republik Indonesia. Khairad, F., Noer, M., & Mahdi, M. (2018). Analisis Pertumbuhan Ekonomi Kawasan Sentra Produksi Subsektor Tanaman Pangan di Provinsi Sumatera Barat. Journal of Regional and Rural Development Planning, 2(2), 171. Liliyen, D., Hernawati, T., & Harahap, B. (2020). Perencanaan Kapasitas Produksi Teh Hitam Menggunakan Metode Rough Cut Capacity Planning Di PT. Perkebunan Nusantara IV Unit Kebun Tobasari. Buletin Utama Teknik, 15(3), 249–254. Lumbantobing, H., Purbasari, A., Anna, B., & Siboro, H. (2018). Analisis Gerakan Kerja Untuk Memperbaiki Metode Kerja Dan Efisiensi Waktu Pengerjaan Produk Menggunakan Metode Most (Studi Kasus Pt. Infineon Technologies Batam). Profisiensi, 6(2). Lusiana, A., & Yuliarty, P. (2020). Penerapan Metode Peramalan ( Forecasting ) Pada Permintaan Atap Di PT X. Jurnal Teknik Industri ITN Malang. Maharani, E. R., & Riyanto, R. (2022). Dampak Pembangunan Sentra Ikm Menggunakan Dana Alokasi Khusus (Dak) Terhadap Banyaknya Industri Kecil Menengah Di Indonesia. Jurnal Acitya Ardana, 2(2), 238–255. Manggabarani, I., & Kandatong, H. (2024). Analisis Permintaan Kedelai Impor Dan Lokal Sebagai Bahan Baku Pembuatan Tahu Di Desa Sugiwaras Kecamatan Wonomulyo. Jurnal Agroterpadu, 3(2007), 237–241. Maryana, & Meutia, S. (2019). Perbaikan Metode Kerja Pada Bagian Produksi Dengan Menggunakan Man and Machine Chart. Jurnal Teknovasi, 02(1), 15–26. Mayasari, A., Rahayuningsih, S., & Komari, A. (2019). Penentuan Waktu Standar Dan Jumlah Tenaga Kerja Optimal Pada Bagian Penyoletan Batik di UD . Batik Satrio Manah. Jurnal Ilmiah Mahasiswa Teknik Industri Universitas Kadiri, 1(1), 1–12. Meirizha, S. N., & Ardiansyah, A. (2017). Analisis Kelayakan Kapasitas Produksi dengan Metode RCCP (Studi Kasus PT. Sewangi Sejati Luhur). Jurnal Surya Teknika, 5(01), 49–54. Mulyani, S., Hayati, D., & Sari, A. N. (2021). Analisis Metode Peramalan (Forecasting) Penjualan Sepeda Motor Honda dalam Menyusun Anggaran Penjualan pada PT Trio Motor Martadinata Banjarmasin. Jurnal Ekonomi Dan Bisnis, 14(1), 178–188. Nadiyah, K., Senjawati, M. I., & Putri, G. R. (2024). / Perbaikan Sistem Kerja Proses Produksi Tahu pada PT XYZ menggunakan Peta-Peta Kerja. JIsAT, VI(1), 26–30. Nupuku, E., Lubis, S. N., & Sirait, B. (2021). Analisis forecasting produksi dan konsumsi beras di propinsi sumatera utara. Jurnal Darma Agung, 370–377. Nursanti, E., Avief, R. M. S., Sibut, & Kertaningtyas, M. (2019). Maintenance Capacity Planning Efisiensi & produktivitas. CV. Dream Litera Buana. Nuryawan, T., & Dwiwinarno, T. (2020). Produktivitas Studi Kasus Pembuatan Seragam Sekolah Dasar Di Cv . Focus Production Tamansari. Jurnal Bisnis Dan Ekonomi, 11(2), 133–142. Pramesti, N. W., Adawiyah, M. R., Melinda, M., Nurhetty, P. A., & Azhar, D. (2023). Perkembangan Industri Tahu Bungkeng di Kabupaten Sumedang Tahun 1990-2000. Pubmedia Social Sciences and Humanities, 1(4), 1–11. Pratama, A., Wulandari, E., & Yuniarti, E. (2023). Pembuatan Standard Operating Procedures (SOP) untuk Pengembangan Usaha Mikro Kecil Menengah (UMKM) Susu Kambing “SUMBE.” Media Kontak Tani Ternak, 5(2), 46. https://doi.org/10.24198/mktt.v5i2.47352 Purbasari, A., Sumarya, E., & Mardhiyah, R. (2023). Penerapan Metode Studi Waktu Dan Gerak pada Proses Packing di PT . ABC. Sigma Teknika, 6(2), 290–299. Putra Utama, A., & Eko Adi Prasetio, D. (2021). Menggunakan Metode Rought Cut Capacity Planning ( Rccp ) Dalam Menentukan Kapasitas Produksi Batu Bata. Prosiding Seminar Nasional Forkepti I4.0 Teknik Dan Managemen Industri, 1, 26–35. Rahmawati, S., Zuhri, S., & Arifin, R. (2023). Analisis Aliran Proses Dan Pengukuran Waktu Kerja Pada Proses Produksi Hospital Equipment: Studi Kasus. Jurnal Kesehatan Tambusai, 4(1), 220–231. Reynaldi, P. A., T, N. B. P. S., Nusa, P. T., Corporation, T., & Ntc, P. (2022). Perhitungan Standard Time Menggunakan Metode Stopwatch Time Study Pada Sistem Produksi Just In Time. Rizal, S., Aryati Rakhmasari, A., Melati, M., Ambry, K., Evionita, P., & Adriel, S. (2024). Analisis Kecacatan dalam Proses Pembuatan Tahu Sumedang Pada CV. X dengan Pendekatan Seven Tools dan New Seven Tools. Jurnal Riset Dan Inovasi Manajemen, 2(3), 58–70. Rusdiana, S., & Maesya, A. (2017). Pertumbuhan Ekonomi Dan Kebutuhan Pangan Di Indonesia. Jurnal Sosial Ekonomi Dan Kebijakan Pertanian, 6(1). Sa’id, N. ., Ma’ruf, A., & Delfitriani, D. (2020). “Penelitian Mengenai Potensi Bisnis Produksi Tahu Sumedang (Analisis Studi Kasus di Pabrik Tahu XY Kecamatan Conggeang) Evaluasi Kelayakan Usaha Produksi Tahu Sumedang (Analisis Studi Kasus di Pabrik Tahu XY Kecamatan Conggeang). Jurnal Agroindustri Halal, 6(April), 105–113. Sabrina, P., Hasanah, F., & Kusuma, W. (2020). Perbaikan Metode Kerja pada Produksi PT. Amerta Indah Otsuka dengan Menggunakan Man and Machine Chart. Applied Industrial Engineering Theory, 01(02), 1–6. Sandi, C. K., Cahyono, Husodo, I. T., & Anggi, P. (2018). Analisis produktivitas pekerja dengan metode time study pada pekerjaan kolom (studi kasus proyek rehabilitasi pasar johar kota semarang). Jurnal Gyratory, 1–10. Santoso, D., Pradipto, M., & Setiowati, R. (2022). Usulan Layout Lantai Produksi Industri Mebel Menggunakan Systematic Layout Planning dan Simulasi. Jurnal Optimasi Teknik Industri (JOTI), 4(1), 7. Septiadi, A., Salmia, & Galuh, H. (2022). Perbaikan Kinerja Melalui Metode Man and Machine Chart Untuk Meningkatkan Produktivitas. Jurnal Valtech, 5(2), 174–179. Septriani, A., & Alfa, B. N. (2021). Perhitungan Metode Rough Cut Capacity Planning ( RCCP ) di Perusahaan Panel Listrik. Jurnal PASTI, XV(1), 59–72. Sri, W. (2023). Analisis Kinerja Perdagangan Kedelai. Pusat Data Dan Sistem Informasi Pertanian Kementerian Pertanian 2023, 58. Sumarsono, & Sumekar, W. (2022). Perakitan pupuk organik untuk tanah padi sawah organik berbasis bio-slurry dari tiga lokasi di Jawa Tengah. In Indonesian Food Technologists (Issue December). Suwarso, R. H., Salmia, S. T., & Priyasmanu, T. (2021). Perencanaan Kapasitas Produksi Menggunakan Metode Rough Cut Capacity Planning (RCCP) pada Home Industri Loca Nusa. Jurnal Mahasiswa Teknik Industri, 4(1), 21–28. Ummah, M. S. (2019). Production Planning and Inventory Control. In Deepublish Publisher (Vol. 11, Issue 1). Wahyudi, R. (2022). Peran Dinas Perindustrian Dan Perdagangan Dalam Pengembangan Industri Kecil Menengah Kota Medan. Jurnal Ilmiah Bidang Sosial, Ekonomi, Budaya, Teknologi, Dan Pendidikan, 1(5), 671–676. Zadry, H. R., Susanti, L., Yuliandra, B., & Jumedo, D. (2015). Analisis Dan Perancangan Sistem Kerja. In Journal of Chemical Information and Modeling (Vol. 53, Issue 9). Zulfa, M. C. (2024). Perancangan Layout Kerja Menggunakan Analisis Studi Gerak untuk Meningkatkan Efisisensi Waktu Siklus. Jupiter: Publikasi Ilmu Keteknikan Industri, Teknik Elektro Dan Informatika, 2(1). | |
| local.eprints.dir | disk0/00/51/40/17 | |
| local.eprints.division | 07A | |
| local.eprints.id | 514017 | |
| local.eprints.type | thesis/2Sarjana | |
| local.eprints.uri | http://scholar.unand.ac.id/514017/ | |
| local.fakultas | Fakultas Teknik | |
| local.identifier.nim | 2110932002 | |
| local.prodi | S1 Teknik Industri | |
| local.thesis.level | Skripsi |