UPT Perpustakaan Universitas Andalas
Repositori PerpustakaanUniversitas Andalas
 

Component Replacement Planning for the Digester and Screw Press Machine at PT SMART Tbk Padang Halaban Mill

dc.contributor.authorValeriesa, Trivia Arneld
dc.contributor.otherAlexie, Herryandie Bronto Adi
dc.date.accessioned2026-09-24T21:22:57Z
dc.date.issued2023-12-14
dc.descriptionDr. Alexie Herryandie Bronto Adi
dc.description.abstractPT SMART Tbk Padang Halaban Mill (PHLM) is one of the palm oil mills owned by PT SMART Tbk which is engaged in the processing of Fresh Fruit Bunch (FFB) into Crude Palm Oil (CPO) and Palm Kernel (PK) with production capacity as 60 tons/hour. Machine failures when the machine is operating which causes PHLM to have to carry out corrective maintenance still often occur, especially on digester machines and screw press machines. Therefore, this research aims to obtain a preventive replacement plan that can minimize downtime. There are two methods used in this research. The first method is Optimal Preventive Replacement Age to Minimize Downtime which is used to determine the optimal component replacement time with the aim of minimizing machine downtime. The second method is Time-Based Modularity Design which is used to group components that have the closest optimal replacement time into one component replacement module. Based on the research conducted, it was found that the longest replacement time is for the shaft component on screw press machine number 6 as 4400 hours. Meanwhile, the shortest replacement time is the adjusting cone bolt for 240 hours. There are three modules on machines number 1, 2 and 3, one module on machine number 4, and there are two modules on machines number 5 and 6. The reductions in downtime on screw press and digester machines number 1, 2, 3, 4, 5 and 6 respectively by 47.17%, 31.23%, 41.05%, 37.40%, 44.79%, and 42.96%. Overall, the downtime reduction for all the screw press and digester machine is 40.83%.
dc.identifier.urihttps://ailib.my.id/handle/123456789/49420
dc.language.isoid
dc.publisherUniversitas Andalas
dc.subjectDowntime Minimization
dc.subjectMean Time to Failure
dc.subjectMean Time to Repair
dc.subjectModularity Design
dc.subjectOptimal Preventive Age Replacement
dc.subject.classificationTS Manufactures
dc.titleComponent Replacement Planning for the Digester and Screw Press Machine at PT SMART Tbk Padang Halaban Mill
dc.typeThesis
dcterms.dateSubmitted2023-12-20
dcterms.referencesAdli, G. Y. (2020). Usulan Keputusan Pemeliharaan Mesin Menggunakan Metode Opportunity Based. Universitas Andalas. Atmaji, F. T. D., & Putra, A. A. N. N. U. (2018). Kebijakan Persediaan Suku Cadang di PT ABC Menggunakan Metode RCS (Reliability Centered Spares). JURNAL MANAJEMEN INDUSTRI DAN LOGISTIK, 2(1), 84. https://doi.org/10.30988/jmil.v2i1.106 Ben-Daya, M., Duffuaa, S. O., Knezevic, J., Ait-Kadi, D., & Raouf, A. (2009). Handbook of Maintenance Management and Engineering. In Handbook of Maintenance Management and Engineering. Springer. https://doi.org/10.1007/978-1-84882-472-0 Buana, F. S. (2019). Usulan Preventive Maintenance Menggunakan Metode Modularity Design Pada Mesin Lime Stone Crusher (LSC) II di Departemen Tambang PT Semen Padang. Universitas Andalas. Dhillon, B. S. (1999). Engineering Maintainability. Gulf Publishing Company. Dhillon, B. S. (2002). Engineering Maintenance: A Modern Approach. CRC Press. Ebeling, C. (1997). An Introduction To Reliability and Maintainability Engineering. McGraw-Hill. Ernawati, D., Puji, E., & Handoyo, R. (2017). Modularity Design Approach for Preventive Machine Maintenance. Journal of Physic. Jardine, A. K. S., & Tsang, A. H. C. (2013). Maintenance, Replacement, and Reliability (2nd ed.). CRC Press. Laggoune, R., Chateauneuf, A., & Aissani, D. (2009). Opportunistic Policy for Optimal Preventive Maintenance of a Multi-Component System in Continuous Operating Units . Computers & Chemical Engineering, 33(9), 1499–1510. Levin, M. A., & Kalal, T. T. (2003). Improving Product Reliability. Wiley. Manzini, R., Regattieri, A., Pham, H., & Ferrari, E. (2010). Maintenance for Industrial Systems. Springer. O’Connor, A. N. (2011). Probability Distributions Used in Reliability Engineering. RIAC. Pratama, P. Y. (2019). Penentuan Biaya Maintenance Pada Komponen Mesin Belt Conveyor Kritis Dengan Pendekatan Preventive Maintenance di Departemen Tambang PT Semen Padang. Universitas Andalas. Silviana, N. A. (2020). Usulan Perawatan Komponen Kritis Pada Boiler Feed Pump dengan Menggunakan Metode Preventive Maintenance. Junal Ilmiah Teknik Industri Prima, 4(1). Stevenson, W. J. (2012). Operations Management (11th ed.). McGraw-Hill/Irwin. Tarigan, P. K. (2012). Sistem Perawatan Mesin Berbasis Preventive Maintenance dengan MEtode Modularity Design pada PT Sumatera Piooner Building Material. Universitas Sumatera Utara. Taufik, & Septyani, S. (2015). Penentuan Interval Waktu Perawatan Komponen Kritis Pada Mesin Turbin di PT PLN (Persero) Sektor Pembangkit Ombilin. Jurnal Optimasi Sistem Industri, 14(2), 238–258. Yicong, G., Yiciong, F., & Jianrong, T. (2015). Product Modular Design Incorporating Preventive Maintenance Issues. Chinese Journal of Mechanical Engineering.
local.eprints.dirdisk0/00/45/96/71
local.eprints.division07A
local.eprints.id459671
local.eprints.typethesis/diploma
local.eprints.urihttp://scholar.unand.ac.id/459671/
local.fakultasFakultas Teknik
local.identifier.nim1910931019
local.prodiS1 Teknik Industri
local.thesis.levelSkripsi

Files

Collections