ANALISIS PELAKSANAAN PEKERJAAN REVITALISASI JARINGAN AIR MUSNAU KECAMATAN PINANG BELAPIS DAN LEBONG UTARA
| dc.contributor.advisor | Rika, Ampuh Hadiguna | |
| dc.contributor.author | Andri, Ferdian Syaputra | |
| dc.date.accessioned | 2026-09-24T22:33:33Z | |
| dc.date.issued | 2025-01-24 | |
| dc.description | Prof. Dr. Ir. Rika Ampuh Hadiguna, MT, IPU, ASEAN Eng | |
| dc.description.abstract | Water loss is the main problem that occurs in the Musnau Water Revitalization work in Pinang Belapis and North Lebong Districts. Water loss can be defined as the difference between the recorded amount of water entering the system and the recorded amount of water leaving the system. In a drinking water supply system, not all of the water produced by the installation reaches consumers. Usually there are leaks here and there which is called water loss. The national tolerance standard for PDAM clean water leakage rates is according to Minister of Public Works Regulation Number 20/PRT/M/2006, namely a maximum water loss of 20%. Of course, achieving this target is not easy, because in reality analyzing the number of physical leaks in the drinking water supply system is difficult to carry out. The aim of this research is to analyze technical and non-technical water loss factors. By collecting data in the field using quantitative methods, several data were obtained which were used to process the remaining pressure calculation data using the EPANET 2.2 application, so that the remaining pressure was obtained which should be maximized on the Air Musnau network system for Pinang Belapis and North Lebong Districts. Keywords : Revitalization, Water Loss, Technical Aspects, Non-Technical Aspects, EPANET | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/66171 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Revitalization | |
| dc.subject | Water Loss | |
| dc.subject | Technical Aspects | |
| dc.subject | Non-Technical Aspects | |
| dc.subject | EPANET | |
| dc.subject.classification | TA Engineering (General). Civil engineering (General) | |
| dc.subject.classification | TC Hydraulic engineering. Ocean engineering | |
| dc.title | ANALISIS PELAKSANAAN PEKERJAAN REVITALISASI JARINGAN AIR MUSNAU KECAMATAN PINANG BELAPIS DAN LEBONG UTARA | |
| dc.type | Thesis | |
| dcterms.dateSubmitted | 2025-01-24 | |
| dcterms.references | Direktorat Jendral Cipta Karya Kementrian Pekerjaan Umum. 2000. Kriteria Penyediaan Air Bersih Rossman, L. A. (2000). EPANET 2: users manual. Kementrian Pekerjaan Umum. 2007. Peraturan Menteri Pekerjaan Umum Nomor 18 Tahun 2007 tentang Penyelenggaraan Pengembangan Sistem Penyediaan Air Minum Badan Pendukung Pengembangan Sistem Penyediaan Air Minum (BPPSPAM). 2013. Pedoman Penurunan Non Revenue Water (NRW) atau Air Tak Berekening (ATR). Jakarta: Kementerian Pekerjaan Umum dan Perumahan Rakyat. Nugroho, S., Meicahayanti, I., & Nurdiana, J. (2018). Analisis Jaringan Perpipaan Distribusi Air Bersih Menggunakan EPANET 2.0 (Studi Kasus di Kelurahan Harapan Baru, Kota Samarinda). Teknik, 39(1), 62-66. Zulman, S. 2023. Analisis Ketersedian Air Bersih Nagari Binjai Kecamatan Tigo Nagari Menggunakan Metode Epanet 2.2 Di Kabupaten Pasaman. Teknik, 22-39. | |
| local.eprints.dir | disk0/00/48/80/75 | |
| local.eprints.division | PI2024 | |
| local.eprints.id | 488075 | |
| local.eprints.type | thesis/5Profesi | |
| local.eprints.uri | http://scholar.unand.ac.id/488075/ | |
| local.fakultas | Pascasarjana (S2) | |
| local.identifier.nim | 2441612029 | |
| local.prodi | Pendidikan Profesi Insinyur | |
| local.thesis.level | Karya Profesi |
