PENILAIAN PERSEPSI OWNER TERHADAP KOMPETENSI KONSULTAN PENGAWAS PADA PROYEK-PROYEK PEMBANGUNAN JALAN PROVINSI SUMATERA BARAT (STUDI KASUS LINGKUNG DINAS PRASJAL TARKIM)
| dc.contributor.author | VISY, ASMERY | |
| dc.date.accessioned | 2026-09-24T21:00:51Z | |
| dc.date.issued | 2016-01-21 | |
| dc.description.abstract | The development of infrastructure (road) in West Sumatera makes the requirement of competent supervision consultants increasing. Electronic government procurement system will increase transparency, fair competition among supervision consultants (between local grade and national grade consultants) in order to acquire construction works. Good competence is crucial in winning the competition. This study aims to map the required competencies of supervision consultant in Dinas Prasarana Jalan Tata Ruang dan Permukiman of West Sumatra province. The research data was obtained through a questionnaire filled by officials who have been involved in the implementation of24 packages of road projects in 2014 in Dinas Prasarana Jalan Tata Ruang dan Permukiman of West Sumatra province. Questionnaires contain 35 variables of competencies which were adopted from Kompetensi Kerja Nasional Indonesia (SKKNI) 2003, several standards and applied regulations of technical competence, also through discussions with stakeholders who have been involved directly in the road project implementations,which subsequently adjusted to the conditions / needs of the superintendent / the owner of the project. The data analysis was using Requirement-Satisfaction Analysis (RSA) method which is modified from Importance-Performance Analysis (IPA) and Importance Satisfaction Analysis (ISA) method through two methods, quadrant analysis method and gap analysis method. The analysis of the data found that the owner level of satisfaction of the supervision consultant’s competence are at an average score of 3.55 (1-5 rating scale, score 3 = moderate). Major deficiencies are identified on supervision consultants, which are: (1) Technically supervision consultants have not been able to represent the project owner to supervise the project with a gap value of the total of 1.70, (2) to provide daily, weekly and monthly report on-time, (3) Intensity of the presence of personnel in the field,(4) to understand the rules and regulations related to the implementation of the work / construction and (5) Understanding of personnel on contract.Therefore, these factors should be a concern, either by supervision consultants themselves and the government as well, in order to perform an excellent work, to achieve the success of the project where the cost, time and quality are met, satisfied purpose and administration, which eventually will lead to the enhancement of the local supervision consultant’s competence. Keywords: competence, construction of roads, gap analysis, quadrant analysis, | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/44547 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject.classification | T Technology (General) | |
| dc.title | PENILAIAN PERSEPSI OWNER TERHADAP KOMPETENSI KONSULTAN PENGAWAS PADA PROYEK-PROYEK PEMBANGUNAN JALAN PROVINSI SUMATERA BARAT (STUDI KASUS LINGKUNG DINAS PRASJAL TARKIM) | |
| dc.type | Thesis | |
| dcterms.dateSubmitted | 2016-03-02 | |
| dcterms.references | Barrie, D.S., dan Paulson, B.C., 1995, Manajemen Konstruksi Profesional , Erlangga, Jakarta. Candra Y. 2011, Studi Pemahaman dan Penerapan Standard Kompetensi KeterampilanKerja Tenaga Kerja pada Pelaksanaan Proyek Konstruksi, Jurnal Teknologi Berkelanjutan Vol. I Ed. 1 (April 2011) 1-8, Fakultas Teknik, Universitas Lambung Mangkurat, Banjarmasin. Departemen Pemukiman dan Prasarana Wilayah, 2004, Keputusan Menteri Pemukiman dan Prasarana Wilayah Nomor 257 Tahun 2004 tentang Standar dan Pedoman Pengadaan Jasa Konstruksi, Badan Pembinaan Konstruksi dan Investasi, Jakarta. Departemen Pekerjaan Umum, 2008, Peraturan Menteri Pekerjaan Umum No: 06/PRT/M/2008 tentang Pedoman Pengawasan Penyelenggaraan Pekerjaan Konstruksi. Jakarta. Departemen Pekerjaan Umum, 2007, Peraturan Menteri Pekerjaan Umum Nomor 43 Tahun 2007 tentang Standar dan Pedoman Pengadaan Jasa Konstruksi. Jakarta. Ervianto, W.I. 2005, Manajemen Proyek Konstruksi. Andi Offset. Yogyakarta. Harmin, 2014, Kajian Pengaruh Kompetensi Konsultan Pengawasan Pada Proyek Irigasi Di Kabupaten Kerinci, Pasca Sarjana Teknik Sipil. UBH. Padang. Hermanto, A.W. 2008, Analisa Tingkat Kepuasan Konsumen Terhadap Pelayanan Terminal Peti Kemas Semarang, Universitas Diponegoro, Semarang. Khasani, R.R. 2013, Evaluasi Kepuasan Pelanggan Terhadap Kinerja Manajemen Proyek Kontraktor Besar Bangunan Gedung, Universitas Diponegoro, Semarang. 120 Kementrian Pekerjaan Umum, 2011, Peraturan Menteri Pekerjaan Umum No: 08/PRT/M/2011 tentang Pembagian Subklasifikasi dan Subkualifikasi Usaha Jasa Konstruksi. Jakarta. Martilla dan John C. J. 1977. Importance-Performance Analysis.” Journal of Marketing”, Vol. 41 No. 1 Januari 1977. Martono, N. 2015. Konsep-konsep KunciMetode Penelitian Sosial . PT Raja Grafindo Persada. Jakarta McClelland, D.C. 1973, Testing for Competence Raher Than Intelligence, American Psychologist, Vol 28(1). Mulyana, D. 1996, Ilmu Komunikasi Suatu Pengantar. PT. Remaja Rosda Karya. Bandung. Mutiara, E.A. 2010, Sistem Pendukung Keputusan Pemilihan Karyawan Untuk Suatu Jabatan Pada Pt. Jamsostek (Persero), Teknik Informatika, Universitas Komputer Indonesia. Bandung. Nunnally, J. C, 1978, Psychometric Theory (2nded.). McGraw-Hill. New York. Parama Karya Mandiri Consulting. PT. 2012. Dokumen Penawaran Paket Pekerjaan "PAKET-21 Pengawasan Teknik Pembangunan Jalan Akses Bandara Kuala Namu Tahap I" Snvt Perencanaan Dan Pengawasan Jalan Nasional Provinsi Sumut. Direktorat Jenderal Bina Marga Robbin, S.P. 2006, Organization Theory : Structure, Design and Applications, Terjemahan Hadyana Pujaatmaka, Benyamin Molan. Prenhallindo. Jakarta. Robbins, S.P. 2002, Prinsip-prinsip Perilaku Organisasi, Diterjemahkan oleh Halida. Edisi Kelima, Penerbit Erlangga, Jakarta. Simamora, B. 2005, Analisis Multivariant Pemasaran, PT. Gramedia Pustakama. Jakarta. Singarimbun, M. 1989. Metode Penelitian Survai. Jakarta: LP3ES 121 SKKNI, 2003, Manajer Pelaksanaan Pekerjaan Jalan ( Site Manager Of Road Constraction ), Departemen Pekerjaan Umum. SKKNI, 2003, Pengendalian Mutu Pekerjaan Jalan ( Quality Controller Of Road Constraction ), Departemen Pekerjaan Umum. Soeharto, I. 1995, Manajemen proyek : Dari konseptual sampai operasional, Erlangga. Jakarta. Spencer, M. L. Jr & Signe M. S. 1993, Competency at work Models for Superior Performace. Jhon Wiley & Sons Inc., New York. Sudarsono, 1997, Kamus Konseling. Rineka Cipta. Jakarta. Sudjana, 2005. Metode Statistika. PT Tarsito, Bandung. Supriyadi, I. 2004, Peran Konsultan Pengawas Terhadap Peningkatan Kinerja Proyek Pembangunan PLTA di Indonesia (Studi Kasus Proyek PLTA di Lingkungan Nippon Koei Co,.Lt). Program Pasca Sarjana Fakultas Teknik UI. Depok. Uyanto, S. 2009, Pedoman Analisis Data dengan SPSS, Graha Ilmu. Jakarta. Walgito, B. 2004, Pengantar Psikologi Umum, Andi. Yogyakarta. Yosritzal, 2014, Studi Implementasi Metoda Importance-Satisfaction Analysis (ISA) pada Penentuan Prioritas Penanganan Pelayanan Kereta Api Padang-Pariaman, Andalas Civil Engineering (ACE) National Conference 2014, 27 November2014, Padang ; Andalas University, Padang. | |
| local.eprints.dir | disk0/00/00/31/82 | |
| local.eprints.division | 07C | |
| local.eprints.id | 3182 | |
| local.eprints.type | thesis/masters | |
| local.eprints.uri | http://scholar.unand.ac.id/3182/ | |
| local.fakultas | Fakultas Teknik | |
| local.identifier.nim | 1320929017 | |
| local.prodi | S1 Teknik Sipil | |
| local.thesis.level | Skripsi |
