ANALYZING THE EFFECT OF UNCERTAINTY AND TRANSACTION COST ON PROJECT PERFORMANCE IN CONSTRUCTION PROJECT AT HOUSING AND CIPTA KARYA DIVISION
| dc.contributor.author | Dinda, Sazkia Andita | |
| dc.contributor.other | Wisnel, M. Sc. | |
| dc.date.accessioned | 2026-09-24T21:13:34Z | |
| dc.date.issued | 2020-08-06 | |
| dc.description | Wisnel M.Sc. | |
| dc.description.abstract | The construction industry is very important in development of a country, because it can increase economic development. The construction project involves many parties, various processes, phases, different stages of work and advice from two sectors, there are government and private sector with the same goals which is the success of the construction project. One of the government services related to construction projects is Dinas Perumahan Rakyat Kawasan Permukiman dan Pertanahan (DPRKPP). The main task of DPRKPP is to carry out the affairs of the city administration in the division of housing and settlement areas and the assistance task. The mission of Dinas Perumahan Rakyat Kawasan Permukiman dan Pertanahan (DPRKPP) are to realize sustainable development of public housing and residential areas, improve the quality of government buildings, and public facilities. This is proven based on infrastructure development that increased from 2017 to 2019.Based on interview with the employee and data obtained from DPRKPP, many problems related to project performance, especially project costs and schedules. According to previous research, the factors that influence construction project performance are the uncertainty and transaction costs of construction projects. Therefore, the aims of this research is to measure and analyze the effect of uncertainty and transaction costs on project performance of construction projects and then propose recommendations to improve the project performance in the DPRKPP. The population in this reserach were employees at DPRKPP and contractor employees with a total of 78 employees and 34 contractors. The data were collected by questionnaire containing the respondent's personal data and the question related indicators of uncertainty, transaction cost and project performance. The method used is PLS-SEM method using Smart-PLS 3 software. The results showed that uncertainty has no significant effect on project performance, uncertainty has a significant effect on transaction costs, transaction costs has a significant effect on project performance and uncertainty has significant effect on project performance through transaction costs. The dimension that most influences the project performance is the uncertainty in the transaction environment and post-contract costs in construction projects. | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/47412 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Project Performance | |
| dc.subject | Transaction Cost | |
| dc.subject | Uncertainty | |
| dc.subject.classification | HD28 Management. Industrial Management | |
| dc.subject.classification | TS Manufactures | |
| dc.title | ANALYZING THE EFFECT OF UNCERTAINTY AND TRANSACTION COST ON PROJECT PERFORMANCE IN CONSTRUCTION PROJECT AT HOUSING AND CIPTA KARYA DIVISION | |
| dc.type | Thesis | |
| dcterms.dateSubmitted | 2020-08-31 | |
| dcterms.references | A.A. Anwar Prabu Mangkunegara. (2000). Manajemen Sumber Daya Manusia, Bandung: PT Remaja Rosdakarya. Abushaban, S. S. 2008. Factors Affecting the Performance of Construction Projects in The Gaza Strip. Thesis, The Islamic University of Gaza, Construction Management, Palestine. Agsarini, Irma. 2015. Pengaruh Faktor Internal dan Eksternal Proyek Terhadap Kinerja Proyek Konstruksi di Provinsi Kalimantan Selatan. Surabaya: Institut Teknologi Sepuluh Nopember. Barrie, Donald S. and Paulson, Boyd C. (1987). Manajemen Konstruksi Profesional. Jakarta : Erlangga. Bresnen, M., and Marshall, N. (2000). Building partnerships : Case studies of client contractor collaboration in the UK construction industry. Journal of Construction Management Economic, 18(7), 819–832. Chan, A.P.C., Scott, D. and Lam, E.W.M. (2002). Framework of success criteria for design or build projects. Journal of Management in Engineering, 18(3), 120–8. Chan, D. W. M, and Kumaraswamy, M. M. (1997). A comparative study of causes of time overrun in Hongkong construction projects. International. Journal of Project Management, 15(1), 55-63. Constantino, N., Pietroforte, R., and Hamill, P. (2001). Subcontracting in commercial and residential construction: An empirical investigation. Journal of Construction Management Economic, 19(4), 439–447. Cushway, Barry. (2002). Human Reseurce Management. Jakarta : PT. Elex Media Komputindo. Dimyati, H., and Nurjaman, K. (2014). Manajemen Proyek. Bandung: CV Pustaka Setia. Dipohusodo, Istimawan. (1995). Manajemen Proyek dan Konstruksi Jilid 1. Yogyakarta: Badan Penerbit Kanisius. Dipohusodo, Istimawan. (1996). Manajemen Proyek dan Konstruksi. Jogjakarta : Kanisius. Ervianto, I.W. (2005). Manajemen Proyek Konstruksi Edisi Revisi. Andi Offset : Yogyakarta. Fornell, C., & Larcker, david f. (1981). Evaluating Structural Equation Models. Journal of Marketing Research, 18(1), 39–50 Ghozali, I. (2008). Structural Equation Modelling: Metode Alternatif dengan Partial Least Square edisi 2. Semarang: Universitas Diponegoro Ghozali, I. (2014). Structural Equation Modeling, Metode Alternatif dengan Partial Least Square (PLS). 4th edn. Semarang: Badan Penerbit Universitas Dipoonegoro. Grigoroudis, E. and Siskos, Y. (2010) Customer Satisfaction Evaluation. New York: Springer. Hulland, J. (1999). Use of Partial Least Square (PLS) in Strategic Management Research: A Review of Four Recent Studies. Strategic Management Journal, 20(2), 195–204 Husain Umar. (2005). Manajemen Riset dan Perilaku Konsumen. Jakarta: PT. Gramedia Pusat. J. Supranto. (1997). Pengukuran Tingkat kepuasan Pelanggan. Jakarta: Rineka Cipta. Khusnul, Sri and Alwafi. (2012). Pengaruh kompetensi Manajer proyek Terhadap Keberasilan Proyek pada Perusahaan Kontraktof di kabupaten Malang. Journal of Media Teknik Sipil. 10(2), 156-168. Kiew, P. N., Ismail, S., & Yusof, A. M. (2013). Key Performance Indicators in Construction Quality Management System. The Second International Conference on Engineering Business Management 2013 (ICEBM 2013). Kuala Lumpur: Universiti Teknologi Malaysia Kuala Lumpur. Kline, Rex B. (1998). Principles and Practice of Structural Equation Modeling. New York: The Guilford Press. Kotler, Philip and Keller. (2007). Manajemen Pemasaran, Jilid I, Edisi Kedua belas, Jakarta: PT. Indeks. Kululanga, G. K., and McCaffer, R. (2001). Measuring knowledge management for construction organizations. Eng. Construct Architect Management, 8(5–6), 346–354. Latan, H. and Selva, T. (2013). Analisis Multivariate Teknik dan Aplikasi Menggunakan Program IBM SPSS 20,0. Bandung: Alfabeta. Lei, Huimin Guo. (2016). Transaction Costs in Construction Projects Under Uncertainty. Journal of Construction Engineeering Management 45(6). 1-14. Li, Huimin, David and Zhuofu. (2013). Factors That Affect Transaction Costs in Construction Projects. Journal of Construction Engineeering Management. 139, 60-68. Li, Huimin, David and Zhuofu. (2012). Transaction-related issues and construction project performance. Journal of Construction Engineeering Management. 30(2), 151-164. Messah, Y. A. et. al. (2013). Kajian Penyebab Keterlambatan Pelaksanaan Proyek Konstuksi Gedung Di Kota Kupang. Jurnal Teknik Sipil. 2(2), 157-168. Mitropoulos, P., and Howell, G. (2001). “Model for understanding, preventing, and resolving project disputes.” Journal of Construction Management Economic, 127(3), 223–231. Ozorhon, B., Arditi, D., Dikmen, I., and Birgonul, M. T. (2010). The Performance of International Joint Ventures in Construction. Journal of Management in Engineering, 26(4), 209–222. Soeharto, I. (1995), Manajemen proyek dari konseptual sampai operasional. Jakarta: Erlangga. Steven Lavender. (1996) Management for The Construction Industry, Longman, Malaysia. Sugiyono (2017) Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung: Alfabeta. Tjiptono, Fandy. (2004). Perspektif Manajemen dan Pemasaran Kontemporer. Yogyakarta: Andi Williamson, O. E. (1985). The economic institutions of capitalism: Firms, markets, relational contracting, Free Press. New York. Yamin, S. and Kurniawan, H. (2011) Generasi Baru Mengolah Data Penelitian dengan Partial Least Square Path Modeling. Jakarta: Salemba Infotek. | |
| local.eprints.dir | disk0/00/06/07/44 | |
| local.eprints.division | 07A | |
| local.eprints.id | 60744 | |
| local.eprints.type | thesis/diploma | |
| local.eprints.uri | http://scholar.unand.ac.id/60744/ | |
| local.fakultas | Fakultas Teknik | |
| local.prodi | S1 Teknik Industri | |
| local.thesis.level | Skripsi |
