DETAILED ENGINEERING DESIGN PROYEK PENGGANTIAN SEGMENTAL TIANG LISTRIK JARINGAN DISTRIBUSI TEGANGAN MENENGAH 13.8 KV DI PERTAMINA HULU ROKAN
| dc.contributor.author | Fajri, Rully | |
| dc.date.accessioned | 2026-09-24T22:33:31Z | |
| dc.date.issued | 2024-12-12 | |
| dc.description | Prof. Dr. Ir. Bambang Istijono, M. Eng, IPU PROGRAM | |
| dc.description.abstract | This Detailed Engineering Design includes the design for the replacement of existing 13.8 kV distribution poles that have substandard or damaged reliability and integrity and the replacement of all necessary accessories including equipment attached to the segmental poles such as ACSR (Conductor), distribution transformers, load breakers, reclosers and capacitor banks. This study contains Electrical, Civil and QA/QC disciplines to produce related results such as design basis, one line diagram, datasheet, standard installation drawings, power line layout drawings, material take off and procedures needed to support construction implementation. According to the scope of work, the selection of areas that will be part of the replacement of the poles will be divided into 3 areas, namely the Duri HO, Bangko and Batang areas. Detailed engineering design is carried out based on input data from the Assest integrity and reliability team regarding which segments need to be replaced in the three areas. Site surveys are carried out to support the data needed in carrying out detailed engineering design such as taking coordinate data, plotting the position of new poles, including interfaces with existing facilities such as existing pipelines, existing electricity poles, buildings and other public facilities. To facilitate the implementation of the construction of the installation of new segmental electric poles, this detailed engineering design also carried out a constructability workshop and also a SAFOP (Safety and operability) workshop as an effort to reduce facility shutdowns that can result in loss of crude oil production or LPO (Loss production opportunities). Keywords: Detailed Engineering Design, Pertamina Hulu Rokan, Electric Poles, Safety & Operability, Loss production opportunities. | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/66155 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Detailed Engineering Design | |
| dc.subject | Pertamina Hulu Rokan | |
| dc.subject | Electric Poles | |
| dc.subject | Safety & | |
| dc.subject | Operability | |
| dc.subject | Loss production opportunities | |
| dc.subject.classification | TK Electrical engineering. Electronics Nuclear engineering | |
| dc.title | DETAILED ENGINEERING DESIGN PROYEK PENGGANTIAN SEGMENTAL TIANG LISTRIK JARINGAN DISTRIBUSI TEGANGAN MENENGAH 13.8 KV DI PERTAMINA HULU ROKAN | |
| dc.type | Thesis | |
| dcterms.dateSubmitted | 2025-01-25 | |
| dcterms.references | Wirawan, Hengki & Hendarwin, Erwin. (2022). General Electrical Design for onshore Facilities . Rokan Technical Standard ; Pertamina Hulu Rokan. Wirawan, Hengki & Hendarwin, Erwin. (2022). Power Pole & Power Line Fabrication & Installation . Rokan Technical Standard ; Pertamina Hulu Rokan. Wirawan, Hengki. Power Line Hardware. (2022). Rokan Technical Standard ; Pertamina Hulu Rokan. Safety and Reliability Directorate - Guide to Reducing Human Error in Process Operation (UKEA) February 1985 SRD R347. NPFA 70E 2009 - ARTICLE 110 General Requirements for Electrical Safety-Related Work Practices. IEC 61882:2016 - Hazard and operability studies (HAZOP studies). Dr C. R. Bayliss CEng FIEE. (1996). Transmission and Distribution Electrical Engineering. MPG Books Ltd ; Great Britain. | |
| local.eprints.dir | disk0/00/48/77/74 | |
| local.eprints.division | PI2024 | |
| local.eprints.id | 487774 | |
| local.eprints.type | thesis/3Magister | |
| local.eprints.uri | http://scholar.unand.ac.id/487774/ | |
| local.fakultas | Pascasarjana (S2) | |
| local.identifier.nim | 2441612033 | |
| local.prodi | Pendidikan Profesi Insinyur | |
| local.thesis.level | Karya Profesi |