Analisis Percepatan Penyelesaian Proyek Pada Pembangunan Gedung Pusat jantung Terpadu (PJT) Rsup Dr.M.Djamil Padang Dengan Metode Duration -Cost Trade Off
| dc.contributor.author | Zulfi Van Leon | |
| dc.date.accessioned | 2026-09-25T16:20:05Z | |
| dc.date.issued | 2020 | |
| dc.format.extent | x,90 hal,;30 cm | |
| dc.identifier.other | S 20 09 63382 | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/199719 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Teknik Sipil | |
| dc.subject | Skripsi | |
| dc.subject.ddc | NONE | |
| dc.title | Analisis Percepatan Penyelesaian Proyek Pada Pembangunan Gedung Pusat jantung Terpadu (PJT) Rsup Dr.M.Djamil Padang Dengan Metode Duration -Cost Trade Off | |
| dc.type | Thesis | |
| local.publication.place | Padang | |
| local.slims.id | 148571 | |
| local.thesis.level | Skripsi |
