Evaluation and Improvement of Backpack Production Line at CV. Andepsuma Anugrah Pratama
| dc.contributor.author | Ridha, Vriany Putri | |
| dc.date.accessioned | 2026-09-24T21:24:07Z | |
| dc.date.issued | 2024-11-07 | |
| dc.description | Dr.Eng. Lusi Susanti, S.T.,M.Eng | |
| dc.description.abstract | The manufacturing industry in Indonesia, particularly the bag production sector within the textile industry, is encountering significant challenges amidst fluctuating global market conditions. According to data from Badan Pusat Statistik (BPS), the national textile export volume for the first half of 2023 experienced a 13% decline compared to the same period in 2022, reflecting the adverse effects of global demand fluctuations and economic instability. Under these circumstances, optimizing production line performance is critical to sustaining competitiveness in an increasingly challenging market environment. One company grappling with these issues is CV Andespuma Anugrah Pratama, a producer of various polyester-based bags. This research aims to evaluate and enhance the performance of the production line at CV Andespuma Anugrah Pratama by employing the principles of motion economy, 5S methodology, and line balancing techniques. The work system improvement process focused on minimizing non-value-added work elements and improving workplace organization through the 5S methodology. Prior to the interventions, the total cycle time was recorded at 4205,9167 seconds, with an efficiency rate of 61.64%. Following the implementation of improvements, the cycle time was reduced to 3053 seconds. The line balancing analysis utilized the Largest Candidate Rule (LCR), Kilbridge and Weston Method (KWM), and Ranked Positional Weight (RPW) techniques. The results demonstrated that the LCR method improved efficiency to 88.71%, the RPW method achieved 90.30%, while the KWM method yielded the most favorable outcomes, with two alternatives achieving efficiencies of 93.09% and 94.40%. The application of motion economy principles, 5S methodology, and line balancing significantly improved production efficiency at CV Andespuma Anugrah Pratama, with the highest efficiency of 94.40% attained through the KWM method. | |
| dc.identifier.uri | https://ailib.my.id/handle/123456789/50018 | |
| dc.language.iso | id | |
| dc.publisher | Universitas Andalas | |
| dc.subject | Motion economy | |
| dc.subject | efficiency | |
| dc.subject | line balancing | |
| dc.subject | line performance | |
| dc.subject | 5S | |
| dc.subject.classification | TS Manufactures | |
| dc.title | Evaluation and Improvement of Backpack Production Line at CV. Andepsuma Anugrah Pratama | |
| dc.type | Thesis | |
| dcterms.dateSubmitted | 2024-11-08 | |
| dcterms.references | Bakar, N. A., Ramli, M. F., Zakaria, M. Z., Sin, T. C., & Masran, H. (2019). Solving Assembly Line Balancing Problem Using Heuristic: A Case Study of Power Transformer in Electrical Industry. Indonesian Journal of Electrical Engineering and Computer Science, 17(2), 850–857. Barnes, R. M. (1949). Motion and Time Study. John Wiley & Sons. Boysen, N., Schulze, P., & Scholl, A. (2022). Assembly Line Balancing: What Happened in The Last Fifteen Years? European Journal of Operational Research, 301(3), 797–814. BPS. (2023). statistik-perdagangan-luar-negeri-indonesia-ekspor--2023--buku-i. Dennis, P. (2015). Lean Production Simplified. CRC Press. Fatmawati, R. (2019). Evaluasi dan Peningkatan Performansi Lini Perakitan Speaker dengan Menggunakan Ekonomi Gerakan dan Line Balancing. Institut Teknologi Sepuluh Nopember. Groover, M. P. (2018). Automation, Production Systems, and Computer-Integrated Manufacturing. Pearson. Hasanah, T. U., Wulansari, T., Putra, T., & Fauzi, M. (2020). Penerapan Lean Manufacturing dengan Metode Takt Time dan FMEA untuk Mengidentifikasi Waste pada Proses Produksi Steril PT.XYZ. Jurnal Rekayasa Sistem & Industri (JRSI), 7(2), 89–95. Heizer, J., & Render, B. (2011). Operations Management 10th Edition (10th ed.). Pearson. Istikomah, M., & Prasetyaningsih, E. (2021). Usulan Perbaikan Lintasan Produksi untuk Mereduksi Waste pada Departemen Kerja Produksi dengan Kombinasi Lean Manufacturing dan Theory of Constraints. Jurnal Riset Teknik Industri, 1(1), 77–87. Jaya, S. E., Meidayanti, K., & Wicaksono, D. W. (2024). Analisis Penerapan Just in Time Sebagai Alternatif Pengendalian Persediaan Bahan Baku Kue Pia Kering Di Ud Kurnia Banyuwangi. Jurnal Javanica, 3(1), 1–13. Lintang Trenggonowati, D., & Febriana, N. (2019). Mengukur Efisiensi Lintasan dan Stasiun Kerja Menggunakan Metode Line Balancing Studi Kasus PT. XYZ. Journal Industrial Servicess, 4(2), 97–105. Liswati. (2018). Produk Kreatif dan Kewirausahaan Teknik Komputer Jaringan. PT Gramedia. Osada, T. (2004). Sikap Kerja 5S. Penerbit PPM. Panchal, P. B., & Deshpande, V. A. (2020). Application of Ranked Position Weighted and Kilbridge and Weston Method at Radiator Assembly Plant - A Case Study. International Journal for Research in Applied Science and Engineering Technology, 8(5), 2717–2724. Putra, A. B. C., & Aryanny, E. (2024). Penerapan Konsep “5S” untuk Menciptakan Lingkungan Kerja yang Ergonomis di PT. Sri Yogyakarta. Jurnal Ilmiah Sain Dan Teknologi, 2(1), 335–343. Simanjuntak, R. A., & Hernita, D. (2008). Usulan Perbaikan Metode Kerja Berdasarkan Micromotion Study dan Penerapan Metode 5S untuk Meningkatkan Produktifitas. 191–203. Stevenson, W. J. (2021). Operations Management. McGraw-Hill. Sutalaksana, I. Z., Anggawisastra, R., & Tjakraatmadja, J. H. (2006). Teknik Perancangan Sistem Kerja. ITB. Sylvia. (2020). Implementasi Metode 5S Sebagai Usulan Perbaikan dan Pengembangan Manajemen Operasional dan Area Kerja di CV. Gatsu Jaya Perkasa Abadi. Journal Industrial Engineering & Management Research (Jiemar), 1(3), 2722–8878. Tahasin, T. A., Gupta, H. Sen, & Tuli, N. T. (2021). Analyzing the Impact of 5S Implementation in the Manufacturing Department: A Case Study. International Journal of Research in Industrial Engineering, 10(4), 286–294. Tarwaka, Bakri, S. H., & Sudiajeng, L. (2004). Ergonomi Untuk Keselamatan, Kesehatan Kerja dan Produktivitas. Uniba Press. Vincent Gasperz. (1998). Production Planning and Inventory Control Berdasarkan Pendekatan Sistem Terintegrasi MRP II dan JIT Menuju Manufakturing 21. PT Gramedia Pustaka Umum. Zadry, H. R., Susanti, L., Yuliandra, B., & Jumeno, D. (2015). Analisis dan Perancangan Sistem Kerja. Andalas University Press. | |
| local.eprints.dir | disk0/00/48/22/48 | |
| local.eprints.division | 07A | |
| local.eprints.id | 482248 | |
| local.eprints.type | thesis/1Diploma | |
| local.eprints.uri | http://scholar.unand.ac.id/482248/ | |
| local.fakultas | Fakultas Teknik | |
| local.identifier.nim | 2010933006 | |
| local.prodi | S1 Teknik Industri | |
| local.thesis.level | Skripsi |
