WASTE MINIMIZATION USING LEAN MANUFACTURING APPROACH AT YANNA BAKERY
Loading...
Date
Authors
Journal Title
Journal ISSN
Volume Title
Publisher
Universitas Andalas
Abstract
Yanna Bakery is one of the manufacturing industries in Padang City that
produces bakery. During the production process, several wastes were found, one of
which was waste over processing. This happens because production employees
work on certain processes more than shown, especially in the process of mixing
ingredients so that the production process time becomes longer than it should be
which causes the demand for bakery per day is sometimes not met. Yanna Bakery
also has an ineffective material flow because the layout of the production area does
not pay attention to the relationship between facilities so that the distance between
facilities is far related which causes the production leadtime to be longer. Therefore,
the problems that occur at Yanna Bakery need to be further identified to find out
the most dominant waste and what factors cause waste to get recommendations for
improvement.
The study employed several methodologies, including Value Stream
Mapping (VSM) to depict the true state of the production process at Yanna Bakery,
Waste Assessment Model (WAM) comprising Waste Relationship Matrix (WRM)
and Waste Assessment Questionnaire (WAQ) to ascertain the waste's score, and
Value Stream Analysis Tools (VALSAT) to categorise activities as necessary non�value added, value added, and non-value added. Fishbone diagram to determine the
source of waste.
Based on data processing carried out using Current Value Stream Mapping
(VSM), a PCE value of 73.05% was obtained. To find out the score of each waste,
calculations are carried out using the Waste Assessment Model (WAM). Based on
the calculations that have been done, the highest waste is overprocessing with a
score of 27% with the second highest is transportation with a score of 24%. This
shows that waste overprocessing and transportation are the dominant wastes that
are prioritized to get repairs as soon as possible. The selected VALSAT tool to
identify value-added and non-value-added activities is Process Activity Mapping
(PAM) with a score of 84.8%. Based on PAM and fishbone diagrams, to eliminate
or reduce waste, overprocessing and transportation by making and implementing
SOPs and good work instructions and re-layout of production areas. With the
implementation of good SOPs and work instructions, especially in work areas that
produce a lot of waste overprocessing, a reduction in production leadtime of 9.91%
was obtained. Proposed re-layout improvements were implemented to reduce
transportation waste. Obtained a reduction in transportation time of 40.92%. After
the improvement recommendations are given, Future Value Stream Mapping
(FVSM) is created to describe the flow of the production process after the
implementation of the proposed improvements. Based on the FVSM that has been
made, there was an increase in Process Cycle Efficiency (PCE) by 11.67%, from
73.05% to 84.72%.