UPT Perpustakaan Universitas Andalas
Repositori PerpustakaanUniversitas Andalas
 

IDENTIFICATION AND REDUCTION OF WASTE TO IMPROVE PRODUCTION EFFICIENCY AT CV PUTRA TANJUNG

dc.contributor.authorAnindia, Okta Dewi
dc.date.accessioned2026-09-24T21:24:06Z
dc.date.issued2024-11-06
dc.descriptionReinny Patrisina, S.T., M.T.,Ph.D
dc.description.abstractToday's manufacturing companies face fierce competition. The ability of each company to meet customer needs and demand for quality and competitive products needs to be continuously improved. CV Putra Tanjung is one of the businesses that produces fish sponge cake in Padang City. To meet consumer demand, this company needs to increase productivity through effective and efficient production activities. This improvement can be achieved by reducing waste and increasing product value. This research aims to minimize the waste that occurs in the fish sponge cake production process at CV Putra Tanjung. Existing waste can be reduced by applying the concept of lean manufacturing. Waste identification using Waste Relationship Matrix (WRM) and Waste Assessment Questionnaire (WAQ) shows that the waste with the highest percentage is motion waste at 36.50%, followed by waste defect at 24.19%, and process waste at 17.60%. Furthermore, a tool was selected to analyze the flow on the production floor using Process Activity Mapping (PAM). The PAM results showed that the value-added activity was 37%, necessary non-value-added activity was 50%, and non-value-added activity was 13%. The causes of waste were identified using a fishbone diagram. Based on the findings, the recommendations for improvement include purchasing a planetary mixer with a whisk attachment, procuring ovens, flour measuring devices, gloves, cooling racks, and standardizing work systems. These improvements are expected to increase the Process Cycle Efficiency (PCE) value by 31.20%.
dc.identifier.urihttps://ailib.my.id/handle/123456789/50009
dc.language.isoid
dc.publisherUniversitas Andalas
dc.subjectEfficiency
dc.subjectLean Manufacturing
dc.subjectMinimization
dc.subjectProduction
dc.subjectWaste
dc.subject.classificationTS Manufactures
dc.titleIDENTIFICATION AND REDUCTION OF WASTE TO IMPROVE PRODUCTION EFFICIENCY AT CV PUTRA TANJUNG
dc.typeThesis
dcterms.dateSubmitted2024-11-07
dcterms.referencesAfif, A., & Purwaningsih, R. (2018). Analisis Waste pada Industri Mebel Dengan Menggunakan Pendekatan Lean Manufacturing Studi Kasus: CV. Jati Mas Semarang. Industrial Engineering Online Journal, 6, 4–12. Amilia, W. (2013). Perancangan Tools Pengukuran Kinerja Perusahaan dan Karyawan dengan Menggunakan Objective Matrix. AGROINTEK, 7(1), 29–37. Andiyanto, S., Sutrisno, A., & Punuhsingon, C. (2017). Penerapan Metode FMEA (Failure Mode and Effect Analysis untuk Kuantifikasi dan Pencegahan Resiko Akibat Terjadinya Lean Waste. Jurnal Online Poros Teknik Mesin, 6(1), 45–57. Ekayani, I. A. P. H. (2011). Efisiensi Penggunaan Telur dalam Pembuatan Sponge Cake. 8(2), 59–74. Gaspersz, V. (2007). Lean Six Sigma for Manufacturing and Service Industries. Gramedia Pustaka Utama. Hines, P., & Rich, N. (1997). The Seven Value Stream Mapping tools. In International Journal of Operations and Production Management (Vol. 17, Issue 1, pp. 46–64). https://doi.org/10.1108/01443579710157989 Mega Musfita, B., & Mahbubah, N. A. (2021). Implementasi Lean Manufacturing Guna Meminimalisasi Pemborosan Pada Proses Produksi AMDK Jenis Gelas Pada PT.XYZ. Serambi Engineering, VI(2), 1683–1693. Nurlaila, Q., Yuniawati, R. I., & Susanti, L. (2019). Lean Manufacturing. CV. Tohar Media. Palupi, E., Wiratmani, E., & Fatoni. (2024). Analysis and Evaluation of Productivity Using the Marvin E. Mundel Method and the Productivity Evaluation Tree (PET) at PT. YZ. Jurnal Teknologi Dan Manajemen, 22(1), 15–26. https://doi.org/10.52330/jtm.v22i1.184 Panjaitan, M. A., Suryantini, A., & Jamhari, J. (2019). QUALITY CONTROL OF RAW MATERIALS FOR CANDIED CARICA USING P-CHART ANALYSIS AND FISHBONE DIAGRAM. Jurnal Aplikasi Manajemen, 17(3), 416–425. https://doi.org/10.21776/ub.jam.2019.017.03.05 Panji Pradana, A., Chaeron, M., & Shodiq Abdul Khanan, M. (2018). Implementasi Konsep Lean Manufacturing Guna Mengurangi Pemborosan di Lantai Produksi. Jurnal OPSI, 11(1), 14–18. http://jurnal.upnyk.ac.id/index.php/opsiTelp. Pradana, T. A., Leksono, B. E., Deny, A., & Samator Intiperoksida, P. T. (2017). Usulan Implementasi Green Productivity untuk Meningkatkan Produktivitas dan Kinerja Lingkungan di PT Samator Intiperoksida. Jurnal MATRIK, 17(2), 21–28. https://doi.org/10.30587/matrik.v17i2.xxx Prihastono, E., & Nur Hayati, E. (2015). Analisis Kelayakan Investasi Mesin Untuk Meningkatkan Kapasitas Produksi (Studi Kasus di CV Djarum Mulia Embroidery Semarang). Dinamika Teknik, 9(2), 47–60. Pujotomo, D., & Rusanti, D. N. (2015). Usulan Perbaikan untuk Meningkatkan Produktivitas Fillingplant dengan Pendekatan Lean Manufacturing pada PT Smart Tbk Surabaya. Jurnal Teknik Industri, 10(2), 123–132. Rachman, T. (2013). Penggunaan Metode Work Sampling untuk Menghitung Waktu Baku dan Kapasitas Produksi di Karungan Soap Chip di PT. SA CHIP DI PT. SA. SA Jurnal InovisiTM, 9(1), 48. Rawabdeh, I. A. (2005). A model for the assessment of waste in job shop environments. International Journal of Operations and Production Management, 25(8), 800–822. https://doi.org/10.1108/01443570510608619 Ristyowati, T., Muhsin, A., & Nurani, P. P. (2017). Minimasi Waste pada Aktivitas Proses Produksi dengan Konsep Lean Manufacturing (Studi Kasus di PT. Sport Glove Indonesia). Jurnal OPSI, 10(1), 85–96. Rohani, J. M., & Zahraee, S. M. (2015). Production Line Analysis via Value Stream Mapping: A Lean Manufacturing Process of Color Industry. Procedia Manufacturing, 2, 6–10. https://doi.org/10.1016/j.promfg.2015.07.002 Satria, T., & Evi, Y. (2018). Perancangan Lean Manufacturing dengan Menggunakan Waste Assessment Model (WAM) dan VALSAT untuk Meminimumkan Waste (Studi Kasus: PT. XYZ). Jurnal Rekayasa Sistem Industri, 7(1), 55–63. https://doi.org/10.26593/jrsi.v7i1.2828.55-63 Suparno, A., Kholil, M., Sa’diyah, F., & H Hasan, S. Bin. (2021). Implementation of Lean Manufacturing and Waste Minimization to Overcome Delay in Metering Regulating System Fabrication Process using Value Stream Mapping and VALSAT Method Approach (Case Study: Company YS). International Journal of Advanced Technology in Mechanical, Mechatronics and Materials, 2(1), 22–34. https://doi.org/10.37869/ijatec.v2i1.41
local.eprints.dirdisk0/00/48/19/91
local.eprints.division07A
local.eprints.id481991
local.eprints.typethesis/2Sarjana
local.eprints.urihttp://scholar.unand.ac.id/481991/
local.fakultasFakultas Teknik
local.identifier.nim2010932042
local.prodiS1 Teknik Industri
local.thesis.levelSkripsi

Files

Collections